<body><script type="text/javascript"> function setAttributeOnload(object, attribute, val) { if(window.addEventListener) { window.addEventListener('load', function(){ object[attribute] = val; }, false); } else { window.attachEvent('onload', function(){ object[attribute] = val; }); } } </script> <div id="navbar-iframe-container"></div> <script type="text/javascript" src="https://apis.google.com/js/platform.js"></script> <script type="text/javascript"> gapi.load("gapi.iframes:gapi.iframes.style.bubble", function() { if (gapi.iframes && gapi.iframes.getContext) { gapi.iframes.getContext().openChild({ url: 'https://www.blogger.com/navbar.g?targetBlogID\x3d2511494968531084637\x26blogName\x3dOne+Shot+Production\x26publishMode\x3dPUBLISH_MODE_BLOGSPOT\x26navbarType\x3dBLUE\x26layoutType\x3dCLASSIC\x26searchRoot\x3dhttps://1shotproduction.blogspot.com/search\x26blogLocale\x3den_GB\x26v\x3d2\x26homepageUrl\x3dhttps://1shotproduction.blogspot.com/\x26vt\x3d4849797330636500326', where: document.getElementById("navbar-iframe-container"), id: "navbar-iframe", messageHandlersFilter: gapi.iframes.CROSS_ORIGIN_IFRAMES_FILTER, messageHandlers: { 'blogger-ping': function() {} } }); } }); </script>
Tuesday, 21 June 2011

Hi guys!! NEW UPDATES!!!!
I know our time schedule seem to be messy. So, I re-arrange the new timeline up, which we must need to do according to prevent any rushing moment to be occur.

Please do according to your job task and before the complete date. As what aini had mentioned, we shall take the inititive to finish our own work. Moreover, I had stated in the timeline:  
"The best solution which what I think is: Allocate task to each of everyone, not as a group, but individual. It’s best in this way. so that we would need to compromise with each other."

Part of my job here is to remind, remind & REMIND you for updating your work task. *Please don't get irritate by that.

 Timeline:
10 June 2011 (Fri)
Mass meeting:

Thing to be done by today:
1.) Scripting
2.)Storyboarding
3.)Logo design
4.) Location chosen
5.)Website design
6.)Talents (Include the characteristic, personality-> Mini portfolio about the character)
7.) Date & time for the shooting ( To be confirm after the meeting)
8.) Update from first meeting to the latest meeting
9.) Equipment form to be filled up
10.) Discussion for first scene
·         Storyline
·         Character
·         Location (Racking)
·         Equipments
·         Make-up, clothes  and colour treatment that we want
·         Video treatment


Job scope:

AINI: Scripting, Storyboarding

TERI: Logo design, location research

KHAIRI: Storyboarding, logo design

KATHERINE: Equipment, publicity, time locater, Make-up/wardrobe Artist

IRAH: Website design, updating, logo design, talents agent


Remarks:
*Those high-light stated FINISH*

Story-boarding: To be done by Khairi and Aini.
Due date: 11th June 2011, Sat

Submit to katherine for update purpose. Clear snapshoot will do.

Logo design: Katherine collects all the draft. Sent it to all member for final decision  by 11th June 2011, sat

Due date: 12th June 2011, sun

Location: To be done by teri.
Due date: 12th June 2011, sun

Submit to Katherine for update purpose

Website & blog design: Done by syahirah
Due date: To be confirmed

Do up the blog design first, as to update the process that we had. *temporary update server

Then follow up with the website design. So that we can transfer the process content to the website.

Talent: Syahirah would be the In-charged.
We need 4 more main casts.

Due date: next week, latest next following Monday

Loan of equipment: Katherine would be the in-charged.

Submit the equipment by 11th June 2011, sat to jose
12 June 2011 (sun)
Updating of blog








Katherine &syahirah will do the updating.

Katherine have to complete the equipment form.

Equipment needed to borrow:
·         Boom Mics
·         Mics stand
·         Camera
·         Tripod
·         Reflector


15 June 2011 (Wed)

Start shooting (First scene)



Venue: Room
Time: To be confirmed
Meeting area: To be confirmed

Director: Aini
Assistor director/photography: Syahirah
Editor: Katherine
Stage manager: Khairi
Audio-man: Teri

Remarks:
First scene would just different shot of the location and voice-over.




16 June 2011- 21 June 2011
20 June 2011, talent already to be confirmed.

Script should be given to them for memorize purpose.

*remember to get his/her contact number, check whether they able to commit their time to us.







***Edited***
We have so many things to be updated.
It supposed to finish up before the deadline.

Here are the things to be done ASAP.
·         Racking of location
·         Storyboard
·         Scripting in a proper format
·         Design of the blog
·         FB account ( Updating meeting and other purpose, easier to inform each of us, prevent miscommunication )
·         Casting


Katherine in-charge of it.

Remakes:
* If able, we can do editing for the first scene first.
Booking of lab (To be confirmed)

Syahirah will need to confirm with the talents about the venue, time and date.

Katherine will in-charge to inform syahirah about the dress code and make-up, so that she able to inform the talents as well




***Edited***
Job Scope:
Teri: Racking of location, take some snapshot photo.  Aini and Khairi should go too, as you guys are story-boarder and script-writer, knowing clearly, what it needed.

Due date: If can, can it be done before next
26th June 2011, sun

Aini & Khairi: After racking of place,  do up the whole story-board and proper scripting.

*Feed-back from khairi- Time limitation & drawing*

I will push back the date till 29th June 2011, at least a week.

22nd June 2011: We will have mass meeting at school again. Helping out with story-boarding and proper scripting. RACKING OF LOCATION HAD TO BE DONE!!!!

Due date: 29th June 2011, Wed

Syahirah: The blogspot design (update website) and FB account.

Sent out the casting form out if there is no other talent we have in our own.

Due date: 26th June 2011, Mon

22nd June 2011, Wed

First scene to be film


*Finish up, we able to do the first scene editing first.

Venue: Syirin place
Time: 11am
Meeting area: School

Director: Aini
Assistor director/photography: Syahirah
Editor: Katherine
Stage manager: Khairi
Audio-man: Teri



29th June 2011, Wed
Second scene etc.
*Need to discuss further
By this time, pre-production had to be done.

These include:
-Script break-down
-Talent confirmation (include talent release form)
-Crew contact ( Include the talent as well)
-Equipment loan
-storyboard

*We have to choose a date before 29th to finish up.
The best solution which what I think is:
Allocate task to each of everyone, not as a group, but individual. It’s best in this way. so that we would need to compromise with each other.

6th  July 2011 (wed)
Trailer for our first film
Everyone have to stay-back discussing about the trailer and do final editing for our first film.
8th  July 2011(Fri)
·         Film should be done.
·         Updating for first production film should be done. (blog)
·         Logo design should be done.


Mid-discussion about the website design



Meet-up with Jose for update purpose.
Updating the detailed proposal:
·         Concept
·         Theme
·         Target audience
·         Artist statement
·         Script
·         Storyboard
·         Post-production and production process
·         Individual role and contribution
13th July 2011(Wed)
Editing the film for trailer

Design of our real website progress update.
Vista lab should be loan beforehand
*Katherine would be in-charge of it.

It will be whole afternoon doing the trailer editing

Syahirah: updating the website progress


we can if we think we can! =)

Wednesday, 1 June 2011

Here are the logo that we had come out with. :)








-katherine,93852
we can if we think we can! =)

Thursday, 19 May 2011

One Shot Production


Documentation on Logo Design
Our group focused our attention towards the aesthetic and logic part of our logo creation. We emphasised the importance of having a meaning in our logo at the same time considering the aspects of the principle of designs. We name our group One Short Production based on the fact that One refers to us being united throughout this project focusing on our task working as a ONE unit and moving forward together. Shot refers to the different shot sizes and frames that are required in achieving our intended video. The whole process of one unit working as a team creating a video through various shots creates a Production. Hence One Shot Production is formed with one objective, to create a video with multiple shots and working as a team in producing an end product, a production.

The colours of the logo has not been finalised yet. It is still under construction. The first logo, the one at top is the chosen logo. The second logo beneath the first is just another logo that we had designed.

We appreciate critics and comments from you based on our logo.

Thank you very the much, (:
we can if we think we can! =)


Our Blog is still under servicing! Will be updating about or project soon! =)
we can if we think we can! =)

Wednesday, 11 May 2011

Agenda
·         Duration of the film
·         Team name
·         Blog account update
This is a short meet-up due to busy schedule on that week.
Duration of the film
Since the requirement is 8-12 min, we decide to make it 10min for our final film.
Team name
Our proposed team name would be “ONE SHOT PRODUCTION”.
The reason why we choose this team name:
·         One represent moving as “ONE”,  work as one whole team together
·         Shot represent all frame to one whole shot
Documentation about our logo would be done.
Blog account update

-katherine,93852
we can if we think we can! =)

Wednesday, 4 May 2011

Agenda:
·         Trailer
·         updates

Trailer

We are not too sure which suggestion is better, Introduction film or promotional film or both.
During the meeting, we had approach Jose about it.

What Jose had suggested:

It’s better to do up both different type of trailer one, “Introduction trailer” & “promotional trailer”. For “Introduction trailer”, the benefits we would get, it able to helps to prepare for audio, video & treatment purpose.  It’s to trigger our target audience to emotion & feeling about the film.

For Actor wise, we do not need to worry much, we are able to find use our teammate as the talents.  For “promotional trailer”, we can come up with a talent audition as to use it to promote the film.  Factor/element we should take note: clothes, make-up, wall colour, colour treatment. This is to enhance the whole film.

Updates

Thing to be done by next meeting:

·         Timeline: Katherine will do up the time-line by tomorrow, 5/5/2011
·         Website/Blog: Syahirah will do up a blog for update purpose and website design
·         Social public:  Syahirah in-charge of creating social media account ( Blogger, you-tube)
·         Storyboard/ script: Khairi & Aini will in-charged.

For the next meeting:
We should come to conclusion that the,
·         Script: Study about script (50%  done) + Storyboard
·         Timeline
·         New E-mail account should be done by next week.
·         What should we do for our “Introduction trailer”

5/5/2011

Timeline:
9th May– 15th May 2011

I’m starting on next Monday onward, to give these 2 days a slacking break.

As what we had mentioned, next wed (11th may 2011) script should be 50% done, so I am making to finish it by the deadline, sun (15th may 2011).
This include the storyboard have to done by that. So that we could do a discussion with our advisor, Jose, on the next 2 meeting, wed (18th may 2011)
18th May 2011 (Wed)
Storyboard discussion with our advisor, Jose + the film name
22th May 2011 (Sun)
Storyboard has to be finalized by that.
25th May 2011 (wed)
Final discussion about the “Introduction trailer” which include,
·         Storyline
·         Character
·         Location
·         Equipments
·         Make-up, clothes  and colour treatment that we want
·         Time-line for production & post-production

*we need to discuss about the time-line for this, so that I can include these factor on the final time-line sheet  (which what you are reading now)
26th May 2011 – 4th June 2011
Finalize the character
Mid-discussion about logo design &Ads purpose (wed, 1st June 2011)
Start on an audition for promotional trailer and the film
7th June 2011 – 14TH  June 2011
In between this period, talents have to be finalize and start working out with them with the schedule.

*remember to get his/her contact number, would they able to commit their time.

Script should be given to them for memorize purpose

Credit roll: It would credit to them.

8th June 2011: logo design have to be done by now
End June 2011 - July 2011 period
Production start

*We should have a discussion during meeting about this beforehand
As I don’t have any idea how to fix in the time
August 2011 period
Post-production & “Promotional trailer” start

We have to do up a “promotional trailer” by that


GUYS: This is only the rough idea that I have within this semester 1 period. I will still continue to update you guys with an additional detail/information.  Any doubts, could point out during the next meeting.

-katherine,93852

we can if we think we can! =)





Profile..~!


OneShotProduction

Team Members:-
Noor Aini Bte Mohd. Azman (Director)
Siti Syahirah Bte A. Razak
Katherine Aw
Lee Tzy Ian
Muhammad Khairi Bin Omar

School: Republic Polytechnic





Words Here...~!


*_TAGG! ;))_*



Carvings...~!

♥ Achieving 2 productions by the end of the year

♥ Finish up our first production



Playlist...~!

CLICK,mixpod

Link/Add Up =)~!

Aini
Syahirah
Katherine
Teri
Khairi

Archives~

~ April 2011~
~ May 2011~
~ June 2011~


Thanks To...♥

Designer
Basecode
Others: DeviantArt, Photobucket

Link Me!


Don't Remove Credits!